Impact Isolation Class and Other Friends
|
|
2
|
131
|
June 10, 2021
|
Plumbing fixture count per Table 403.1 IBC 2018
|
|
1
|
301
|
June 10, 2021
|
Sorting out Mechanical Systems
|
|
0
|
114
|
June 10, 2021
|
Changes in Cost Workshop but for PDD?
|
|
2
|
113
|
May 31, 2021
|
How to Read Deflection Limits Table IBC Table 1604.3
|
|
5
|
205
|
May 30, 2021
|
Electrical Switches
|
|
1
|
168
|
May 29, 2021
|
DewPoint Calculation within the wall Assembly
|
|
7
|
291
|
May 29, 2021
|
Story Drift
|
|
2
|
157
|
May 28, 2021
|
Permit Cost Estimation
|
|
2
|
143
|
May 27, 2021
|
Slab on Grade Construction
|
|
6
|
151
|
May 25, 2021
|
Fire Barrier vs Fire Partition Table 508.4
|
|
3
|
384
|
May 17, 2021
|
Code References in Exams
|
|
1
|
137
|
May 17, 2021
|
Where am I supposed to click on a detail per NCARB?
|
|
1
|
126
|
May 16, 2021
|
PDD - IBC separating rate between occupancy
|
|
2
|
214
|
May 10, 2021
|
Slope Length Clarification
|
|
3
|
186
|
May 3, 2021
|
PDD Practice Exam 2 Case Study
|
|
5
|
176
|
April 15, 2021
|
PDD Practice Exam 2 Case Study - Vegetated Roof
|
|
2
|
191
|
April 8, 2021
|
Heat loss through walls by BTU rate
|
|
7
|
242
|
March 30, 2021
|
Difference between Exit Discharge and Egress Court
|
|
2
|
326
|
March 26, 2021
|
STC ratings
|
|
1
|
222
|
March 16, 2021
|
Structures Refresher
|
|
3
|
248
|
March 8, 2021
|
Vapor Barrier Location
|
|
6
|
398
|
February 22, 2021
|
Roofing atttachements
|
|
2
|
174
|
February 21, 2021
|
Openings between a motor-vehicle related occupancy and a room used for sleeping purposes shall not be permitted
|
|
2
|
183
|
February 19, 2021
|
Practice Exam #1 Question #19
|
|
4
|
337
|
February 17, 2021
|
Fan coil unit vs fan coil terminal
|
|
2
|
181
|
February 16, 2021
|
Weekly Practice Quizzes?
|
|
1
|
204
|
February 15, 2021
|
Construction Scheduling Question
|
|
5
|
269
|
February 1, 2021
|
Studying Code
|
|
11
|
546
|
December 1, 2020
|
Acoustic calculation
|
|
5
|
390
|
December 1, 2020
|