# Cost of structure and mep

**URL:** <https://community.blackspectacles.com/t/cost-of-structure-and-mep/3533>\
**Category:** Project Planning & Design\
**Created:** [September 26, 2021, 3:18am UTC](https://community.blackspectacles.com/t/cost-of-structure-and-mep/3533 "2021-09-26T03:18:35Z")\
**Posts on this page:** 1\
**Showing post:** 3

<div class="post-metadata">

**Author:** ![coachheidimetcalf](https://blackspectacles.com/uploads/images/20.png) [@coachheidimetcalf](https://community.blackspectacles.com/u/coachheidimetcalf)\
**Post date:** [October 13, 2021, 8:27pm UTC](https://community.blackspectacles.com/t/cost-of-structure-and-mep/3533/3 "2021-10-13T20:27:31Z")

</div>

PS - I also found a few previous community questions that related to these topics so I wanted to link to them here as well.

[Flexural Failures vs Compression Failures](https://community.blackspectacles.com/t/flexural-failures-vs-compression-failures/2790)  
[Cost Estimating Source](https://community.blackspectacles.com/t/cost-estimate-source/2830)

---

_[View the full topic](https://community.blackspectacles.com/t/cost-of-structure-and-mep/3533)._
