High Stakes, Low Perm: Managing Vapor in Exterior Walls on the ARE

This is so helpful for both practice and studying for the ARE - thank you for taking the time to share your wisdom with the community @coachchrishopstock!

A piece of advice I was given when I designed my first exterior wall assembly was that you must:

  1. Do what you can to prevent water from entering the wall assembly, and
  2. Know that water/vapor will enter the wall assembly, so you must make sure that it has a way to get out.

The first point is a given, but the second point was surprising to me at first and has always stuck with me as a reminder of how a successful wall assembly should function. Hope for the best, prepare for the worst :slightly_smiling_face: