Hello,
Could I get some clarification on the following case study question from Practice Exam #3? The attached RFP as written leads me to believe the question has an error.
The architect is preparing a fee schedule.
Which of the following items can the architect include in the fee? Check the three that apply.
Printing bid documents (Incorrect. Per section VIII of the RFP, fees shall include all reimbursable costs other than plan/document printing costs at the bidding phase of the project.)
Required project meetings (Correct. Per section VIII of the RFP, fees shall include all meetings needed to successfully complete the project.)
Costs of the request for proposal (Incorrect. Per section IX of the RFP, responding architects will bear the cost of the RFP.)
Plan submittal fees (Correct. Per section VIII of the RFP, fees shall include required plan submittal fees.)
Reimbursable costs (Correct. Per section VIII of the RFP, fees shall include reimbursable expenses.)
Costs pertaining to interviews (Incorrect. Per section IX of the RFP, responding architects will bear the cost of the interviews.)
I spent a great deal of time on this question as I could not understand how there were three correct answer choices, per the RFP I only saw two correct answers. The RFP addresses the included fees in three separate locations. Once in Section IX, which clearly states that both âCosts for the request for proposalâ and âCosts pertaining to interviewsâ fall on the respondent, making them incorrect. It is also addressed in Section VIII, âFees shall include ALL meetings needed to successfully complete this project and ALL reimbursable costs other than plan/document printing costs (incurred for this bidding phase of the project) and required plan submittal fees.â While this sentence clearly selects âRequired project meetingsâ and âReimbursable costsâ as answers, the lack of an Oxford comma in this sentence had me confused as to whether or not plan submittal fees were or were not to be included in the fee proposal. These are the only two sections addressed in the answer descriptions. However, the Fee Proposal Form at the end of the document makes it clear that plan submittal fees will also be a reimbursable expense outside of the Fee Proposal, in the same way as the printing of bid documents: âThe Fee shall be expressed as a flat dollar of total construction costs for the Project (the only allowable reimbursable will be plan submittal fees and plan printing costs in the Bidding & Contract Award phase â all other costs are within the Fee of: _____.â The lack of a closing parentheses is not my own typo, it is missing in the RFP, so it is unclear purely by punctuation if both are acceptable reimbursables. But, in contrast to the sentence in Section VIII, printing costs is now the item in question. The only logical conclusion I could draw is that these items were on equal footing. The closing parentheses was supposed to be after the word âphase,â not the word âfees,â and no Oxford comma was necessary in Section VIII because both were âother thanâ items. Neither of these were then correct answer choices.
Apart from the typo of the missing parentheses, is the question correct as written and I am missing something? Or, are there only two correct answers?
Thanks!