Practice Mock exam question - An architect is working on a large project with a construction manager (CM) as contractor. All designers and engineers have been retained, and the design is approximately 50% complete. Due to the size of the project, the CM is unable to secure a bond for the entire contracted project. Smaller construction contracts will be necessary. The owner and architect want all design and construction team members to continue in their current roles. Which delivery method should the architect recommend to the owner?
A. Design-build B. CM as-advisor C. Multiple prime D. Design-bid-build
Hi friend,
Did you have a question about the content ?
-Keristen
YES! what is the answer ?
Hi @surbhighodke,
Thanks for writing in! Upon submission of a practice exam, you are provided with a full score report of your performance, which breaks down correct and incorrect answers (with explanations and references to source material). I encourage you to review your practice exam results for confirmation of the correct answer and reasoning of this question.
If you have a follow-up question or are confused about the reasoning behind a question/answer, writing here is a great way to get further clarification! Simply let us know what you’re confused about so that we can assist you. We ask that you also provide us with the form number (1, 2, or 3) and the five-digit item ID number (found at the bottom right corner of your screen). This way, we will be able to locate the specific practice exam question and assist you further. Please do not post any screenshots of paid material.
Hope this helps! Happy studying 
Kiara Galicinao, AIA, NCARB
Black Spectacles
1 Like