Hi, I am failing to see how I could’ve gotten this question correct based on the study materials I was provided and the graphic shown in the video I just watched. Just wanted to put it out there in case anyone else was as confused as me…
the answer explanation on the right is correct. The video graphic is confusing and wrong, although the B101 is technically a contract between the owner and architect, it is not a contract document for construction between the owner and the contractor. See Article 1 of A101 to clarify what is included in the contract documents.