Change Order forms show up in both Division 00 and 01
|
|
2
|
61
|
September 24, 2025
|
|
Question regarding response must be issued as addenda whether requestion is accepted or rejected
|
|
1
|
83
|
September 24, 2025
|
|
RFI rejection:
|
|
3
|
130
|
September 17, 2025
|
|
The meaning of "preconstruction"
|
|
2
|
51
|
September 17, 2025
|
|
Elevator Submittal Review... NCARB ARE CE practice exam
|
|
2
|
73
|
September 17, 2025
|
|
Isn't the Architect liable if he does not coordinate his drawings with his own structural consultant?
|
|
2
|
103
|
September 17, 2025
|
|
I thought Architects weren't supposed to direct means and methods
|
|
2
|
63
|
September 17, 2025
|
|
Bulletin vs Change Order
|
|
1
|
289
|
September 17, 2025
|
|
CE Exam Section 2.2 is missing
|
|
1
|
42
|
August 12, 2025
|
|
CE day 12 of 30 day challenge
|
|
1
|
42
|
July 31, 2025
|
|
Scenario from workshop: "When Work Needs to be Changed"
|
|
1
|
55
|
July 30, 2025
|
|
Retake- Reset CE Program
|
|
1
|
73
|
July 29, 2025
|
|
Day 6 flashcards
|
|
1
|
65
|
July 25, 2025
|
|
About the situation when hazmat is discovered
|
|
1
|
115
|
July 22, 2025
|
|
Confusing grammar and wording on CD Practice Exam Form 1 Case Study 2
|
|
1
|
31
|
July 15, 2025
|
|
CE Quiz Break 11 tests material not yet covered
|
|
1
|
71
|
July 15, 2025
|
|
CE Form 1 Practice Exam question explanation includes incorrect information
|
|
1
|
63
|
July 9, 2025
|
|
Life Cycle Cost Analysis LCCA
|
|
1
|
74
|
July 8, 2025
|
|
Who prepares the punch list?
|
|
1
|
316
|
June 27, 2025
|
|
CE and PA
|
|
1
|
109
|
June 12, 2025
|
|
Material deflection
|
|
3
|
83
|
June 6, 2025
|
|
Technical Key Black Spectacles Videos list for CE Prep
|
|
1
|
130
|
May 30, 2025
|
|
CE Practice Exam #1 - Case Study 2 Question 8
|
|
1
|
85
|
May 19, 2025
|
|
CE Study Group
|
|
6
|
186
|
May 13, 2025
|
|
CE Form 1 Question: Which of the listed facilities will require an electrical power commissioning plan?
|
|
1
|
112
|
April 17, 2025
|
|
Which format to issue revisions to uncordinated contract documents found after start of construction phase?
|
|
3
|
68
|
April 17, 2025
|
|
How is prequalifying a contractor for a publicly bid project not considered "Bid Tampering"?
|
|
3
|
60
|
April 17, 2025
|
|
The architect notices that the connection details are different from the ones proposed in the contract documents
|
|
3
|
94
|
April 17, 2025
|
|
CE Form 3 Practice Exam: Documenting discrepency in field report, wo whom should Architect assign the action item to reolve the issue?
|
|
1
|
71
|
April 15, 2025
|
|
CE Form 3: A contractor is submitting a bid for a project where the extent of exterior gravel landscaping has not been determined
|
|
1
|
50
|
April 15, 2025
|